Hyundai E&C cancels €458m petrochemicals deal with Iran due to sanctions
South Korean Hyundai Engineering & Construction has cancelled a KRW594bn (€485m) deal to build a petrochemical complex in the southern Iranian province of Bushehr, due to impending US sanctions.
In a regulatory filing on 29 Oct, the Seoul-based company said it terminated its contract with Ahdaf Development Co. on 28 Oct, due to what it described as “deterioration of external conditions such as economic sanctions”.
As a result of the sections sanctions, said the Korean firm, the contractor's ability to procure funds and execute the project had become “virtually impossible”.
The US is re-imposing sanctions against Iranian crude oil as of 4 Nov, following President Trump’s withdrawal from a historical nuclear pact with Tehran in May.
Iran and Hyundai E&C signed a contract last March to build Kangan 2 petrochemical complex and auxiliary facilities in the southern Bushehr province, to produce 350 kilotonnes per annum (ktpa) of heavy polyethylene and 350ktpa of light polyethylene.
This article is only available to subscribers - subscribe today
Subscribe for unlimited access. A subscription to European Rubber Journal includes:
- Every issue of European Rubber Journal (6 issues) including Special Reports & Maps.
- Unlimited access to ERJ articles online
- Daily email newsletter – the latest news direct to your inbox
- Access to the ERJ online archive